Volume Calculation - Based on Division of Square Method

As we have seen in the previous section that although average method is very easy, it nullifies the cutting and filling if both cutting and filling are there in a given project. To reduce such errors, division of square method is used.  This method also has the same limitation as that of an average method, but here since the whole data is divided into smaller blocks, nullifying effect is applicable to only those blocks where there is cutting and filling, and hence this method reduces the error to a great extent.
Earthwork Volume Division Of Square

Box

Level 1

Level 2

Level 3

Level 4

Average

Final Level

Depth of Cut

Area of Box

Volume of filling(Cubic meter)

1

20.70

19.60

19.20

20.50

20.00

20

0.00

9

0.00

2

19.60

19.00

13.40

19.20

17.80

20

2.20

9

19.80

3

19.00

18.50

8.30

13.40

14.80

20

5.20

9

46.80

4

18.50

18.40

16.90

8.30

15.525

20

4.475

9

40.275

5

18.40

18.60

18.40

16.90

18.075

20

1.925

9

17.325

6

20.50

19.20

19.10

20.10

19.725

20

0.275

9

2.475

7

19.20

13.40

8.70

19.10

15.10

20

4.90

9

44.10

8

13.40

8.30

0.60

8.70

7.75

20

12.25

9

110.25

9

8.30

16.90

10.90

0.60

9.175

20

10.825

9

97.425

10

16.90

18.40

18.30

10.90

16.125

20

3.875

9

34.875

11

20.10

19.10

19.00

19.80

19.50

20

0.50

9

4.50

12

19.10

8.70

14.40

19.00

15.30

20

4.70

9

42.30

13

8.70

0.60

12.20

14.40

8.975

20

11.025

9

99.225

14

0.60

10.90

12.10

12.20

8.95

20

11.05

9

99.45

15

10.90

18.30

17.80

12.10

14.775

20

5.225

9

47.025

16

19.80

19.00

19.10

19.40

19.325

20

0.675

9

6.075

17

19.00

14.40

19.30

19.10

17.95

20

2.05

9

18.45

18

14.40

12.20

19.10

19.30

16.25

20

3.75

9

33.75

19

12.20

12.10

18.80

19.10

15.55

20

4.45

9

40.05

20

12.10

17.80

18.50

18.80

16.80

20

3.20

9

28.8

21

19.40

19.10

19.10

19.10

19.175

20

0.825

9

7.425

22

19.10

19.30

19.00

19.10

19.125

20

0.875

9

7.875

23

19.30

19.10

18.90

19.00

19.075

20

0.925

9

8.325

24

19.10

18.80

18.80

18.90

18.90

20

1.10

9

9.90

25

18.80

18.50

18.60

18.80

18.675

20

1.325

9

11.925

26

19.10

19.10

18.90

19.00

19.025

20

0.975

9

8.775

27

19.10

19.00

18.80

18.90

18.95

20

1.05

9

9.45

28

19.00

18.90

18.70

18.80

18.85

20

1.15

9

10.35

29

18.90

18.80

18.60

18.70

18.75

20

1.25

9

11.25

30

18.80

18.60

18.50

18.60

18.625

20

1.375

9

12.375

Total Qty

930.60


Volume Calculation - Average Earthwork Method     Volume Calculation - Contour Method